1)define the critical items in rcc framed G+18 bldg. as Cr
Activity 1,Cr Activity 2,Cr Activity 3...etc.
2)on what logic is MSP and Primavera planning based.FS SF
FF...
Answer Posted / prashanth
1.Sub structural works
Mass excavation,Footing works,Plinth works,backfilling
(required),Drainages,Plumbing works
2.Super structure works
Columns,Slab,block work,joinery,plastering,Tiling works.
3.Fire line,water line,Electrical works.
4.Snags/Punch list.
5.Final handover.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
Define aligned dimension?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
how to calculate the density for high density concrete ? or is it same as the density of RC?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
Formula for calculation volume of essentric footing
How can explode a block?
what radial pressure, the NP2 class rcc pipe can sustain?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
what is the formula for Mass of cement grout (Dg)=???
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is .Dwg?
Why Vitrified tile are getting pop up.
how to calculate freeboard in under ground water tank and technical details
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)