1)define the critical items in rcc framed G+18 bldg. as Cr
Activity 1,Cr Activity 2,Cr Activity 3...etc.
2)on what logic is MSP and Primavera planning based.FS SF
FF...
Answer Posted / prashanth
1.Sub structural works
Mass excavation,Footing works,Plinth works,backfilling
(required),Drainages,Plumbing works
2.Super structure works
Columns,Slab,block work,joinery,plastering,Tiling works.
3.Fire line,water line,Electrical works.
4.Snags/Punch list.
5.Final handover.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
What is c.g.i sheet which used for roof??
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
what is total volume of ingredients used in concrete accordingly
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
How does a traffic light signal work ?
How long does it take concrete to harden?
Who name us Engineer & Why?
hi guys what happens if you are absent for a supplymentry exam?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
what does the grad of cement shows (denotes)?
how to identify np3 pipe and np4 pipe
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
what else we can add rather than admixture in concrete to reduce the cement quantity?