Can we DELETE all the Generations of a GDG at once, WITHOUT
deleting the GDG itself ?
Answer Posted / deepak narasappa
During such scenario..always create dummy GDG version at
the end of job.. SO whenever your job runs, atleast one
dummy file will be present and also you can avoid abend..
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How to submit a jcl from cics?
When space is allocated for an output dataset, what units can be used?
WORKING-STORAGE SECTION. 01 GROSS-PAY. 05 BASIC-PAY PIC 9(5). 05 ALLOWENCES PIC 9(3). PROCEDURE DIVISION. MOVE 1000 TO BASIC-PAY. MOVE 250 TO ALLOWENCES. DISPLAY GROSS-PAY. STOP RUN. 77 W-A PIC 9(3)V99 VALUE 23.75 77 W-B PIC ZZ9V99 VLAUE 123.45 after the statement MOVE W-A TO W-B what will be W-B's value? a.123.75 b.b23.75 (where b indicates space) c.023.75 d.invalid move
Explain the purpose of the dd keylen parameter?
What is the motivation behind coding class parameter in job statement?
I want to join to input files and write the matching fields on to an output file but i dont want the output file a sorted one
How can an in-stream dataset be terminated?
Must tape dataset definitions include vol=ser specifications?
I have many files which i am receiving from client everyday. I have one step for every file to check for empty or not. Here client gives 30 files i need to check for every file for empty or not and i need to perform 30 steps. Can I do it in single step. Dynamically i need to change the File name in my step.
Differentiate between the joblib and the steplib statements?
//S10 EXEC PGM=ICETOOL //TOOLMSG DD SYSOUT=* //DFSMSG DD SYSOUT=* //CON DD DSN=VAR.INPUT1,DISP=SHR // DD DSN=VAR.INPUT2,DISP=SHR //OUT DD DSN=VAR.OUTPUT,DISP=(NEW,CATLG,DELETE), // SPACE=(CYL,(5,5)),UNIT=SYSDA //TOOLIN DD * * Splice the needed data from the two VB files together SPLICE FROM(CON) TO(OUT) ON(5,5,CH) WITHALL - WITH(12,5) WITH(22,20) VLENMAX /*
What are the difference between jcl and jes?
I have mainpgm(abc) this is the only cobol pgm(non-db2).And this pgm calling subpgm name "acd" this also only cobol(non- Db)and this pgm calling some other subpgm this pgm has cobol-db2 pgm. 1) IF you calling static mode how to run and how to compile? 2) IF you calling dynamic mode how to run and how to compile? plz suggestion me.
what is SOC4 error?
what are the various stages of job processing?