Answer Posted / thanga muthalali
1000 litters
| Is This Answer Correct ? | 30 Yes | 0 No |
Post New Answer View All Answers
difference between fc and fc'?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is an ortho mode?
What are the advantages of cad?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
What out turn civil works
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Define the various stages of the project planning process in construction.
What is the per cu. mt. price of ready mix in Gujarat region.?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what is the permanent solution applied for restoration of leaning tower of pisa?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.