Answer Posted / venky
it means stopping sight distance. it is the sum actual
distance covered before the stop and braking distance.
:=vt +v^2/2gf
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
what discoveries did you have in relation to your course?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
how to tie 10 legged stirrups
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What is the ideal size of the living room ranges from small to large size?
What is type failure of road surface? how to repair the failure of road surface?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
Cement consumption of one cubic meter of aerocon blocks masonry?
undistributed samples are obtained by
What is rate of concrete surface rendering work per sqm
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
what is moment-curvature relationship in semi rigid connections??
how many shuttering material required for 1000 sq.m built up area.