Answer Posted / m.mahesh
Pile foundation is one of the
typs of deep foudaton.it is an
elemnt of constrction usd as
fundton.it may be driven in
ground verticaly or with sm
inclinaton to transfr the load
safly.typs-undr
reamd,timbr,cmposte,stel,
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
in plate load test what is the thickness of plate 20mm 5mm 50mm none
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
List out some of the checking’s, done at the completion of construction?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
what is m30 in concrete tiles
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
What is c.g.i sheet which used for roof??
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Which is the latest version of solidsworks?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
2. What are the advantages of your present job, things you like about it?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?