Answer Posted / sethupathy
2500kg/cum
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Floor tile measurement? Wall to wall or skirting to skirting
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
what is the difference between natural draught cooling tower and induced draught cooling tower
residential buildings,mixing of concrete,structural,construction material,site handling.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
five requirements of infill panels for walls?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
How to calculate material and labor required for 100 m2 plaster?
Explain how you can turn off the display for dimension in CAD?
What is rate of concrete surface rendering work per sqm
what is anchorage length,lap length and (dont remember the last one)
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Different sizes of Hollow blocks and its weight. Thanks.