Answer Posted / imthiyaz khan
I think we use concrete for bonding, therefore we know that
concrete is good in compression and week in tension ,(for
this question the ans may be greater than 4.75 mm sand)
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Basic questions of civil engineering
How do you compute the volume of airflow?
Which prize is the alternative to the NOVEL Prize?
Why should you consider yourself fit to be hired by jindal steel.
What is meant by autocad?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
what is the dimensions of river sand truck trailer or trolly ?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
how i convert mm into standard wire guage (SWG)no.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
What is command line?
how to calibrate the RM 800
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?