Answer Posted / riyaj mulani
7850 kg/cum
| Is This Answer Correct ? | 13 Yes | 1 No |
Post New Answer View All Answers
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
what is moment-curvature relationship in semi rigid connections??
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
I what know about life time of frp tank plz explain about it specifications & other details
i need gate exam civil engineering question papers with answers
What are wooden shingles?
What is the crank length in the slab?
What are the phases inspections are done by local authority while construction?
What is the compressive strength of fly ash bricks?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
Why do you want to work here
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.