1.How much strength will be attained for M30 grade of
concrete after 28 days?
2.Is it attain 30 N/mm2 or target mean strength?
Answer Posted / bidyut dey
1.after 28 days it will be attained 30 N/MM2
2.Terget mean strength
| Is This Answer Correct ? | 29 Yes | 4 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what is column foundation
what are the code used for residental building?
plumbing CPVC fitting FTE Brass full form
to draw bm diagrams for portal frames under different loadings//
how i can tak Quantity of mortar in block work
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
How to construct a water sump in a rocky soil?
How to do bbs in excel format
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
how to create our resume?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????