Answer Posted / shiva ram reddy
to get into industry first off all study the industry nd then ask all off u r nearers nd then tink wheather u hav ability or not . now dont waste u r time by roaming to stuido just select the right person that u vil believe on him aand just go nd meet him dude ALL THE BEST FOR U R CARRER FROM SHIVA 9989313749
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How much cement and sand required for 9"brick wall per square metre
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
How to arrive dry volume of concrete (1.52 to 1.57) ?
what's the formula for calculate pcc for matt(45mm aggregate)?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
why we are useing plastic under the lean concrete?and whts the advantage?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
What is unit weight of normal concrete?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Define aligned dimension?
what are RIB slabs explain about it
Cement consumption of one cubic meter of aerocon blocks masonry?
how much cement sand n bricks required in im3?and how much in plaster?
How to plan a project
What is an ice dam sock?