Answer Posted / sarfraz
1:0.75:1.5
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
what is the construction cost for per cft of multistorryed building in kolkata?
what does the grad of cement shows (denotes)?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Why is the statue of liberty made of copper?
how much tempareture are required to make liquid state of pid leed
What is zoning permit?
What is fineness modulus ? and its sieve # ?
What quantity of 1.0 m3 bricks required?
Is it possible to make a feature using an overdefined sketch?
What is the general specifications of a bituminous pavement road?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Rate analysis of Vitrified tile in cement mortor 1:3
Explain different types of rcc pipes.