What is steel requirement for one cum concrete
Answer Posted / neeraj bhatnagar
steel required for one cum concrete that is generally
design factor,
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
What is meant by autocad?
How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?
How much material will consume for following specification water tank (9*7.5*6 feet)?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
five requirements of infill panels for walls?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
How do you determine specific gravity of cement?
insted of bentonite we can use any alternate material in piling ?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)