Answer Posted / naresh kumar n
KN/SQ.CM
| Is This Answer Correct ? | 4 Yes | 7 No |
Post New Answer View All Answers
hi guys what happens if you are absent for a supplymentry exam?
Define What is the difference between routing maintenance and major maintenance in school facilities?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
How to arrive dry volume of concrete (1.52 to 1.57) ?
Doul Bar reinforcement and details of drawing.
what could be the production cost of 1 cum of concrete by CP30 plant
what are the duties of Site Engineer in work site?
What is made from large rocks, which protects the base of cliffs?
explain what do you mean by the property development.
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is cross hair cursor?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
What is meant by autocad?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation