Answer Posted / sanjay kumar
IS 1489 Part (1)Fly ash Based and IS 1489 Part (2)
calcinised clay based
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
how many material required for brickbat water proofing of toilets.
strength vs shape factor
what is the design procedure for building
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Test procedure of fly ash bricks as per code ?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
Which code is used for tor & tmt steel bar?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What are the Types Of DPC and its Thickness used?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how clculate excavated or backfilling quantity by simpson's rule
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
how much cement and sand required for 1cum rr masonry