Answer Posted / dhamu
4.5m
Is This Answer Correct ? | 12 Yes | 7 No |
Post New Answer View All Answers
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
use ofr concrete as per grade ?
what is education Cess.
how i can tak Quantity of mortar in block work
pls tell me , what is the water content
What is meant by solid geometry?
What is Grid floor and mention its advantages ?
what is anchorage length,lap length and (dont remember the last one)
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
pls tell me about method of cutting length of ties column
Explain major difference between auto level and dumpy level?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What is meaning of FREE STANDING STAIRCASE ?
What do you mean by bond? What are the different types of bonds?