What should be the size (Cubic meter) of a water tank for
1000 Ltrs. capacity?
Answer Posted / nchauhan
size of water tank is 1m*1m*1m
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
what is meant by shear center?????
what is work of planning deptt. in any construction compny (in road project)
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
what is the exact dia of 8swg and 10swg gabion wire
What is the software used in civil engineering?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
why do we not deduct volume of steel to find actual volume of concrete in practical???
what is constat for brickwork
how much cost of single coat 20mm thick plastering per sqre meter
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
What are the joints wants to made in masonry where door opening, arches like etc..
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
whats is difference between anchorage length and development length