what is the shuttering normal clear cover for footings,
walls, beams & columnms
Answer Posted / venkateswarlu vattigunta
for footings 50mm
for columns 40mm
for beams 25mm
for slabs 25mm
| Is This Answer Correct ? | 12 Yes | 4 No |
Post New Answer View All Answers
Whats the meanig of ,'K' VALUE in the case of soil.....
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
What is need for setting limits?
Explain what is structural frames or systems?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Why the statue of liberty is made of copper?
What are the different softwares used for cad?
What out turn civil works
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
why the openings of sieves are square io size?
what is diffrence between catchment area,watershed and basin?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
significance of specific surface area of particles?
whaat is blister in box girder bridge and what is its function..