Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
What are the problems one might face while having a Cantilever balcony?
What is the absolute pressure scale?
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
Define block?
what is the weight of 10mm,20mm,40mm aggregate
How much material is required for constructing a 2 Lane 2Km rigid pavement road
sir, whitch is the best book (writer name) for prepration of gate....
Why should you show Client/Engineer activities clearly on the project plan?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How much quantity of rod binding work by a rod binder per day
what discoveries did you have in relation to your course?
What are the advantages and disadvantages of lead products in construction?