Hi,
My requirement is when we create an order with reference to
quotation or contract (mainly) the quantity should not be
changed in sales order.So i would like to know how to do
these settings if i want to control these???
Its very urgent for me.
Thanks in advance.
Answer Posted / sanjit
in copy control there is a option header sales doc to sales doc complete reference if you check then user cant change the quantity
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
What is workflow? Name the person who can assist you while configuring a workflow for a system.
What are the different complaint process documents in sap sd. Explain.
How have you used MASS tool in your last project, and to upgrade what data?
How can a customer can connect his SAP ECC system to his SAP CRM system
Are there any user exits or any other way to include new fields in the sales order va01?
is LE module is better than SD module to get a job in SAP? becouse i think sd consultant are more than LE is it?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
What exactly is automatic posting can you explain?
What is availability check? When and at what level is availability check carried out?
What is higher level item category?
How do you create customer account number ranges for external assignment?
What is the use of customer account group?
What is the transaction code for assigning company code to fiscal year variant.
Explain sales document blocking?
Can the items in a billing document belong to different distribution channels?