What"s mean by water bound macadam road(WBM)?
Answer Posted / manjunath.a.s
Water Bound Macadam shall consists material of clean crushed coarse aggregates mechanically interlocked by rolling so that the voids are filled by screening n binding materials with assistance of water,laid on sub grade,sub base or base course or on existing road surface based on requirements.
| Is This Answer Correct ? | 41 Yes | 21 No |
Post New Answer View All Answers
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is meant by dimensioning?
In case if concrete box girder bridges how is the number of cells determined?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What is the difference between built area and super built up area?
What is Refuse Area In High Rise Building ?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how many types of survey and what are levelling instrument?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is conrete grade ,how are depent on concrete grad and size of concrete?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
how much one carpenter can doing shuttering of slab in one day