What"s mean by water bound macadam road(WBM)?
Answer Posted / manjunath.a.s
Water Bound Macadam shall consists material of clean crushed coarse aggregates mechanically interlocked by rolling so that the voids are filled by screening n binding materials with assistance of water,laid on sub grade,sub base or base course or on existing road surface based on requirements.
Is This Answer Correct ? | 41 Yes | 21 No |
Post New Answer View All Answers
Difference between lime, distemper and plastic emulsion?
how to prepare site mix design
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
Define What is the origin of name Railway Sleepers?
What is the usage of zoom command?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
How much time Required for PPR pipe network testing
What is the per cu. mt. price of ready mix in Gujarat region.?
What is Rankine Cycle?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
How foundation is designed, Column design and beam design
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags