Construction Joint are providing for continues of Structure. normally we R making structure by span so to connect the one span to another span we r making construction Joint.
Expansion Joint R providing for keep gape between two structure due to consideration of earth quick.

Is This Answer Correct ?    2 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

1680


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

1377


How to build the floor to ceiling bookcase?

830


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

1580


The concrete slump recommended for beams and slabs; is?

768






A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

1837


density of crush sand & crush stone or grit powder

6309


What is absolute coordinates?

703


Slab quantity 

1616


Basic civil interview questions 

1864


Explain the Strength of brick?

665


How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1472


how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1601


225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.

2926


Describe the various methods of concrete curing?

686