Answer Posted / rajeshkumar
pile or raft
| Is This Answer Correct ? | 30 Yes | 0 No |
Post New Answer View All Answers
What are the RISKS during the project construction?
what is diversion?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Explain what is the release of lien?
What is the difference between chamfer and fillet?
I want to join bhel because
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
what mean By core Billing
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
How to calculate Volume of Wet cement concrete for a specific grade?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
150mm bricks size how many use 4.14 m3
Which is the direction for positive angle?
Stringer How many cm goes to landind