Answer Posted / suresh baria
in 1 cub/mt 4" brick (Without Mortar) will be = 650 nos
Brick size (Without Mortar) .22 * .07 *.1
Vol(Without Mortar)=.00154 M3
No of 4" bricks=1/.00154= 650No's
in 1 cub/mt 4" brick (With Mortar) will be = 525 nos
Brick size (With Mortar) .23 * .08 *.1
Vol(With Mortar)=.001902 M3
No of 4" bricks=1/.001902 = 525 0No's
in 1 cub/mt 6" brick (Without Mortar) will be = 303 nos
Brick size (Without Mortar) .22 * .15 *.1
Vol(Without Mortar)=.0033 M3
No of 6" bricks=1/.0033= 303No's
in 1 cub/mt 6" brick (With Mortar) will be =256 nos
Brick size (With Mortar) .23 * .15 *.11
Vol(With Mortar)=.003898 M3
No of 6" bricks=1/.003898= 256No's
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is thumb rule in quality and quantity estimation of a Residential building??
wat would be the probable interview questions and GD topics for IOCL exam?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
what is idealized curve for concrere and steel
what is Short bored pile foundation.
to draw bm diagrams for portal frames under different loadings//
How do You Maintain a structure after getting cube test of low strength.
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
what is the calculation of raw material for 0.35cum of m-15
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
what is the use in canals of longitudinal drains and cross drains in lining areas?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??