• What is the overall structure of your job and how did
you fit the structure?
Answer Posted / rakesh.r
MD-> GM ->PROJECT MANAGER-> QUALITYMANAGER->QUALITY
ENGG->qc inspectors->supervisors->workers
I am quality control engg and I am in mid level
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
State the laws of thermodynamics and its importance of in mechanical engineering.
What do you understand by catenary cable ?
If any machinery or transmission needs periodic ana regular lubrication . what is the best method to give it?
What are the causes of positive and negative propeller slip?
In 10.00-20 tyre. what is the meaning of .00 ( after10) ?
Enumerate some trouble of fuel injection valve
What is the spinning jenny?
How work the mobail vibrator
Explain why will an ice cube placed in a cup of hot rotating water spin automatically faster than the water itself?
How does iron ore turn into steel?
What color are thermal oil piping lines?
Define isometric drawing?
What type of pump is commonly used is feed water system in auxiliary boiler?
Draw a crankshaft and show the parts?
how to identify the odd man out in the arranged particular type of object