qube strenth in 7nth days test

Answer Posted / suresh

68 % of the Target mean strength

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can we construct building without foundation providing only grade beam at ground level

1073


cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building

1987


How many litres of water used for curing of 1000sqft of slav

1028


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1214


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1676






What is the release of lien?

698


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2621


What is gravity flow?

685


how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2

1451


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

1858


What is the difference between built area and super built up area?

690


What are the advantages of building a dam on the river nile?

643


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1224


What is proportion of PCC Grade G?

1605


How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?

1543