Answer Posted / satya paul
function of dry lean concrete is to provide firm base to support traffic over pqc pavement.there should be no bond between pqc and dry lean concrete.after laying dry lean concrete with the help of paver and compacted with roller passes.minimum eight times up and down i.e total 16 passes.it should be sprayed with MC0 grade bitumen primer.cracks will appear from 10m to 15 distance depending upon cement quantity,mix grading of aggregate ,temperature and wind speed,
before laying pqc ,500 micron anti static polythene sheet shall be laid over dry lean concrete.cube strength of dry lean concrete shall be 5n/mm2 and above.higher cement depends upon the strength required for sub base.max size of aggregate shall not be more than 20 mm.good mix falls in the middle portion,weaker mix falls at the ends.take sample from the end and compare with the middle portion of concrete.difference in strength shall not vary more than 6%.
| Is This Answer Correct ? | 20 Yes | 3 No |
Post New Answer View All Answers
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
what is the weight of 12mm aggregates?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is missing report and how to prepare
How much cement and sand required for 9"brick wall per square metre
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
Explain what is change order request?
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
In Residential home construct footing,beam, column,lintel,rcc roofs which dia rod used how to self assumed
What is Rankine Cycle?
what is work of planning deptt. in any construction compny (in road project)
how many BSCs can i connect to the HUAWEI MSC
what is stressing