Answer Posted / sachin metry
A temporary bench mark is moveable object that has a known
elevation..
| Is This Answer Correct ? | 32 Yes | 10 No |
Post New Answer View All Answers
What is a hatch patterns?
What are the applications of cad?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Dear Sir What is the Contraction joint for base Slab
Which is the latest version of solidsworks?
Explain what is structural frames or systems?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
I have an span length 16 ft c/c
What is the meaning of a blue land surveyors flag?
What is the difference between Fe 500, Fe 500 D and Fe 515.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
what would be the design load of R.C.C Cooling tower per cell.?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
what is the Asfalt test?in road constraction..?