Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

pointing raju,ayesha says"he is the son of my mother's
brother's wife". how is ayesha related to raju?

Answer Posted / ramir v. agustin

cousin

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which IS Code/American Code applied for coupler test of steel

2624


what is called the inverd level of mabhole chamber?

2115


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2102


How many are the types of joints?

1189


Explain the Strength of brick?

1082


What happens to Load at yielding ?

1407


Formula of area of crane hook

2015


Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.

2616


afe or not

2169


Explain what is progress payment?

1149


What is the largest concrete dam in the world?

1181


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1574


what is the difference between natural draught cooling tower and induced draught cooling tower

2271


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

2047


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3765