As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / ramir v. agustin
Do corrective action on areas with non conformance and
ensure quality standards and specifications are
complied.Keep records of the cause of the problem and the
solutions undertaken for future references.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
What is aggregate?
What things architect have to take care of before starting any project?
What is min thickness,min grade of conc & age of PQC ?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
insted of bentonite we can use any alternate material in piling ?
Define What materials were used to build the Golden Gate Bridge?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
what is project?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What is the cemnent ratio
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar