how much quantity of cement bags are required to fill the
one m3 of empty container.?
Answer Posted / nantha
one bag of cement contains-1.25 cft
so filling of i cum cement required 28.3 bags
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
what is w/c ratio in dry lean concrete for m10 mix design
How many mortar required for Brickwork of 1 Cu.m works??
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
For a washout valve why are two gate valves required in normal practice?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
Explain what is progress payment?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
crank types
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
States some of the tool bars used in cad?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...