how much quantity of cement bags are required to fill the
one m3 of empty container.?
Answer Posted / nantha
one bag of cement contains-1.25 cft
so filling of i cum cement required 28.3 bags
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
.5Ast
What is meaning of tlc
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is BPM in concrete demolition hammers. what is better a higher value or lower
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Questions related to civil.engg in company
The largest size of paper used in plotter to print the drawing made by Autocad .
how much cost of single coat 20mm thick plastering per sqre meter
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
which formula used for calculate the area of segmental arch?
Water filter calculation formula