Though Column is a compression member and concrete takes
compression, why we use steel at column ?
Answer Posted / engr. pabitra chandra paul
To resist buckling.
| Is This Answer Correct ? | 30 Yes | 1 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
How can we demolish concrete beams?
Why Vitrified tile are getting pop up.
residential buildings,mixing of concrete,structural,construction material,site handling.
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
density of crush sand & crush stone or grit powder
difference between trapezoidal and pedestal footing and how the load acts on that
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
what is the meaning of 40/20 src