Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why high Voltages come in multiple of 11, like 11 KV, 33KV,
66 KV, 132 KV etc.

Answer Posted / shibuss

I dis agree with all the answers above.
There is no mathematical/electrical reason.
If form factor (1.11) or multiple is the reason what about
400kv and 765kV (Highest transmission voltages in India)

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is circuit recombiner and how it is different from circuit breaker

1885


acb(AIR CIRCUIT BREAKER)NOT CHARGING AUTO

2398


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1984


can i connect REF and Differencial relay in 1 CT core for transformer protection?

1956


what is thresold of perception

2076


DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT

5539


Why use the vcb at high transmission system ? Why can’t use acb?

1325


What is the classification of hydro projects based on installed capacity?

1193


What is online and offline ups? how does it works?

2163


What happen in ups if phase reverse?

2291


What is resistance reading of earth copper rod with grid and without grid?

1150


Can you explain about pole discrepancy scheme

2183


what is alluminium arm in ab conductors

1995


what is meant by 3rd hormonics ?

2024


to hook up ten 50 amp rv pedastels at a lenth of 600 feet from the service what size will my service need to be and the size of wire will I have to run to each pedastel in series??????

2092