what is lead time, planning time, planning fence time ?
Answer Posted / subhrant
lead time is the time for the processing of the total
operation .it is the sum of the setup time,processing time
and tear down time. it is the actual operating time
planning time fence is the time period for which the prod,.
planning cant be disturbed
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Explain what is routing in sap pp?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
How can you create production order without routing and BoM?
What is the difference between stock transport order and stock transfer order?
What are gaps? Some examples?
Integration between PP and SD module.
How to insert an inspection checkpoint at the end of an operation?
What are the levels of batch, explain batch determination process?
What is the production process in sap?
How do you get the system to update this value from the routing?
What are dynamic actions? Give a few examples. What are it’s you used in them?
What is a 'product hierarchy'?
Explain PI sheet.
What is Planning time Fence?