what is lead time, planning time, planning fence time ?
Answer Posted / subhrant
lead time is the time for the processing of the total
operation .it is the sum of the setup time,processing time
and tear down time. it is the actual operating time
planning time fence is the time period for which the prod,.
planning cant be disturbed
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
a company needs 12 standard values. how it can be maintained?
How to delete a group of products that was created in screen mc84 ?
Define mrp group
Why and how you calculate WIP?
Explain what is prt (production resource tools) in sap pp?
After doing realization how we will check whether it is working or not?
List out the activities carried out in production planning?
What is the Difference between TECO and CLSD?
what are the problems you faced in MRP?
What is the t-code for changing production order and to display production order?
what do you mean by planning time fence
What are basic dates?
Explain variant configuration
What is Individual and collective requirements and differecne between them in MTO scenario?