why the SCAN time of DCS is more & that of PLC is less?
if the SCAN time of DCS then why we use DCS.
Answer Posted / kyle condran
DCS are not PC based. the configuration and operating software are but the actual control happens in a control module. DCS usually have a fixed scan time 50ms+, but not always, regardless of I/O count or program size.
PLC scan time depends on Program size and I/O used in the program.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Explain why use mmwc unit?
how many types of viberation transmitter and how to calibrate and where use of vibration transmitter
How to Calibrate Vibration Probe (Axial, Redial) in field
any questions on motor and energy conversions machines?
Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..
Hi, I am Newely Joined in Construction company instrument engineer? Any one can Plz tell me How can I advanced preparation for Releated Engineering and construction Documents?
How many interlocks at turbine side?
If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?
flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty
Which type of diagphram use in costic line,DM water line,natural gas line,oil line?
Why rdt and thermocouple both give different output .and one things more, how to generate ohm or mili volt plz mail me merajalam143545@yahoo.com
Please asked me How calculate DCS controller memory.
what is basic difference between motion balance and force balance in pneumatic instrument?
what is the difference between Cv and air consumption? why the customer needs Air consumption details?
describe flow nozzel principle?