What is the difference between M20 and M25 concrete?
Answer Posted / reyazuddin haider
difference of Grade
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
What is progress payment?
at which depth the construction of tunnel is economical from cost and engineering aspect.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what is right & short method of measurement of slab&beam
Write short note on construction programme for pile foundation.
What are the different types of runners?
Define What are the uses of Groynes?
How to calculate Volume of Wet cement concrete for a specific grade?
What is the release of lien?
what is hydrostatic paradox?
can stub column take the load as main column
What are the steps involved in the concreting process?
What are the advantages of cad software?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)