20*10*10 cm
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How many square meter can mason layout chb per hour
.5Ast
is concealed wiring a problem in fly ash brick wall?
How to calculate carrying capacity of the existing water supply trunkmain
what is the productivity in aluminium shuttering per day
Technical Question of Civil Engineering
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What is the difference between one-way slab and two-way slab?
How is the leaning tower of pisa supported?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what r the precaution for high in atp tempareture,low in atp tempareture
How do we test on design and style in a software?
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!