how to calculate steel columns beams and slab please give
me brief calculation
Answer Posted / surajit naha
plz follow the types of problems and design of mixing with
quantity survey.
enerally we assume 1 to 5 percentage steel in columns of
concrete.1 to 2 percent in beams,0.7 to 1% in slabs and .5
to .8% in footings.
if concrete is 100 cum.
than in column if we take 1.5% steel it will be 1.5 cum steel.
1.5x7850kg/cm3(density of steel.)
quantity of steel determined.
| Is This Answer Correct ? | 24 Yes | 18 No |
Post New Answer View All Answers
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
What is 1/8 on the architect ruler denotes?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
How can I make justification between using concrete grade c35 compare c37?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
what is the meaning of 40/20 src
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand