Answer Posted / madhubabu
15cm*15cm*15cm
| Is This Answer Correct ? | 31 Yes | 0 No |
Post New Answer View All Answers
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
Which type of plywood & sizes using in construction projects ?
what is the hanekom repairing material after concreting work
In earth work 1300 cum soil how to calculate how many liters require in water
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
what isload waring calculation
What is the difference between built area and super built up area?
What is bylayer?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Which is the latest version of solidsworks?
what is your role of in previous company as a construction manager
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
Define the various stages of the project planning process in construction.
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches