how much quantity of cement bags are required to fill the
one m3 of empty container.?
Answer Posted / husain
28.8 bags of cement required to fill one m3
| Is This Answer Correct ? | 73 Yes | 8 No |
Post New Answer View All Answers
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
Volume of 25kg putty bag & 40 kg putty bag volume??
Why are separation membranes used between concrete pavement slab and sub-base?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
what is the relation between pitch of steel and depth of slab?
What is the likely strength of a 1:2:4 concrete mix?
Explain the mechanism of cavitations in pipes and drains?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
Why should you show Client/Engineer activities clearly on the project plan?
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building