as a site engineer, you need not check soil bearing capacity
and etc. because the designer has already considered the
bearing capacity during designing. you have to check the
following-
1. the drawings used for survey, shuttering, reinforcement
are of latest revision or not.
2. check the survey report
3. check alignment (co-ordinates) of foundation as per drawing
4. check reinforcement details as per drawing/approved BBS
5. check the dimension of foundation
6. check for PCC top level and RCC top level (as marked in
inner face of shuttering)
7. check for concrete cover at bottom and sides
8. check for alignment of pedestal reinforcement dowels
9. check for tying of rabars specially at every crossings
10. check for de watering, if necessary
11. check for arrangement of manpower, vibrators, access for
pouring etc.
12. if everything is ok, sign the concrete pour card and
proceed for pouring.
11.
| Is This Answer Correct ? | 34 Yes | 1 No |
Post New Answer View All Answers
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
how to control PQI (Project Quality Index)
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
Explain how you can turn off the display for dimension in CAD?
it is a corrected question." make a list of engineering property(properties) of soil.
What is an ortho mode?
what is grade intersection?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
what is your role of in previous company as a construction manager
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
what is the weight of 10mm,20mm,40mm aggregate
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
States some of the commonly used commands in cad software’s?