Convert the following infix expression to post fix notation
((a+2)*(b+4)) -1 (Similar types can be asked)

Answer Posted / vivek sharma

in post fix notation operator symbol is placed after its two
operands
eg: to add a & b we can write as ab+ or ba+
((a+2)*(b+4))-1
((a2+) *(b4+))-1
(a2+b4+*)-1
a2+b4+*1- ans

Is This Answer Correct ?    55 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Area of triangle=(1/2)*b*h base increased by 4 times & height is divided by 2, the net effect of area?

860


Find out the Simple Interest paid for a sum of $4000 at the rate of 8% per annum for 3 months.

834


Three friends divided some bullets equally. After all of them shot 4 bullets the total no.of remaining bullets is equal to that of one has after division. Find the original number divided.

678


the average of seven numbers is 2.5 then their product

666


A and B's temperature are 10°c and 20°c having same surface , then their ratio of rate of emmisions is ?

722






Complete the given number series 240, 240, 120, 40,?, 2 ?

789


A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?

643


A chain is broken into three pieces of equal lenths containing 3 links each. It is taken to a backsmith to join into a single continuous one . How many links are to to be opened to make it ?

948


If a person walks at 14 km/hr instead of 10 km/hr, he would have walked 20 km more. The actual distance travelled by him is?

940


600 tennis players 4% ->wrist band on one wrist of remain 96%->25%->on both hands remain no of ---

748


A cycled from P to Q at 10 kmph and returned at the rate of 9 kmph. B cycled both ways at 12 kmph. In the whole journey B took 10 minutes less than A. Find the distance between P and Q.

819


pick the odd one out bend shave chop whittle shear

1917


Complete the series: 5, 20, 24, 6, 2, 8, ?

1024


Integral ET(epsiolan transpose)*sigma*dV P=strain displacement vector Q=stress-strain deformation Find [K]

714


If it takes 10 technicians working 6 hours to build a server. They start woring at 11 AM and 1 technician is added per hour starting at 5 PM. At what time they will finish the server?

771