Meaning of m20 and m200 concrete
Answer Posted / dipen
Generally M20, 20 MEAN 20 KN/MM2
SAME AS M200, 200 MEAN 200 KG/CM2
Is This Answer Correct ? | 15 Yes | 16 No |
Post New Answer View All Answers
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
What is specific gravity???
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
Consumption of Binding wire for fixing of cover block in vertical surface
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
What is Base Shear ?
Difference between lime, distemper and plastic emulsion?
how to calculate the scour depth
in plate load test what is the thickness of plate 20mm 5mm 50mm none
what is mean by c32/40s concrete class
how i get all type of short type question answer about civil engg
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
what r you reqired for concrete baching plant?
What are the different softwares used for cad?
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??