A and B can do a piece of work in 72 days; B and C can do it
in 120 days; A dn C can do it in 4 days. Who among these
will take the least time if put to do it alone?
Answer Posted / hashmizadeh
A
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
A mother is 30 years older than her daughter however she will be only thrice as old as the daughter after 5 years. What is mother’s present age ?
3x+4y=10, x3 + y3=6, What is the minimum value of 3x+11y=?
A thief steals half the total no of loaves of bread plus 1/2 loaf from a bakery. A second thief steals half the reaming no of loaves plus 1/2 loaf and so on. After the 5th thief has stolen there are no more loaves left in the bakery. What was the total no of loaves did the bakery have at the beginning.
A man walks around a rectangle. The time taken by him in travelling the length is twice as taken in travelling the breadth of the rectangle. If the perimeter of the rectangle is 300 mts, what is the area of the rectangle?
3/p=6, 3/q=15 ......find p-q
3 angles or 3 sides r given. Which will form a triangle?
In a well of 20feet depth, a frog jumps 5feet up in the morning and comes 4feet down in the evening, on which day the frog gets out of the well.
A&B fill 3 litres and 5 litres of oil in the car. C pays Rs. 8/- to A7B. How much will A get?
In the combinations of 2,3,6,7 how many possible combinations divisible by 4?
JSW steel online test questions
In a pond ecosystem, large fishes and small fishes will be there. If we want to remove small amount of pollutants, small fishes are to be employed. In a food chain food passes through a number of mouths and en route the mouth of the super feeder-the eagle. Its population determines the size of the ecosystem. But this has been proved false.What can you infer from above? (4 choices)
Need Questions Related To Quants
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18 9 3
A triangle has sides of lengths 10, 24 and k. k is a positive integer. The number of values of k for which this triangle has three acute angles is
A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.