If A can complete a work in 6 hours, and B can complete it in
8 hours, then how much time would they take to complete the
work together?
Answer Posted / ranjith
frds check this
A can complete a work in 6 hours
B can complete it in 8 hours
total timing is 6+8=14
14/2=7
total timing it takesis 7hours
| Is This Answer Correct ? | 5 Yes | 16 No |
Post New Answer View All Answers
Find the next number in the series 12,21,,112,121,122---
If a train covers 600m in 0.5 seconds, how long it will cover in 10 seconds?
Ganesh and Shankar travel abroad and take more luggage than the airlines allow. They have to pay extra money for it. They carry 52 kgs together and pay $60 and $100 respectively. Now, if the same luggage was carried by only Ganesh it would cost him $340. If the airlines charges only at one rate for extra luggage what is the maximum luggage that a person can carry without paying extra?
if x/y =4 and y is not '0' what % of 'x' is '2x-y'
If DBMDVUUB = CALCUTTA Then BOMBAY = ?
A simple interest amount of Rs 6000 for 6 months is Rs 600. Calculate the annual rate of interest.
In 80 coins one coin is counterfeit what is minimum number of weighings to find out counterfeit coin
Find the next series: AA AB BC CE ?
In a group of 15,7 have studied Latin, 8 have studied Greek, and 3 have not studied either.How many of these studied both Latin and Greek
A fruit seller had some balls. He sells 40% balls and still has 420 balls. How many balls he had initially?
Complete the series: 5, 20, 24, 6, 2, 8, ?
Mary's father's brother is Andrews Andrews daughter's son is Sunil Brothers name is Sam Who is Sam to Sunil?
In a party there are women and cats.There are 18 heads and 72 legs altogether. How many women and cats?
Find the next series: SE QU EN TI ?
Fathers age is 5 times his son's age. 4 years back the father was 9 times older than son.Find the fathers' age.