what is the pre commissioning test to be carried out on LT power panel at site?
Answer Posted / arasusulo
checking the all of bus
bars tightness and visual
short at phase to phase and
neautral...
then megger the separate
phase and ntral bus too.
then circiut braker
condition tooo.then charge
the supply and check ph
voltage and line voltage.
switch on the braker then
dstrbt the suppply by the
feeder what it is..?
Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
Why the standard of ambient teperature mentioned as 40 degree celcius in machines.
for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?
What is Bolted fault?
what will happen if OLR CT in all phases are short circuted
HOW TO CALLICULATE RESITENCE,REACTANCE AND IMPEDENCE VOLTGE OF TRANSFORMER 13.33 KVA 144/240 VOLTS 93/56 A WITH FORMULA
what is the solution for meger test failed the MV cable?
Logic using 1 kV or 1,1 kV grade in house wiring Low voltage cable. Explain/suggest? some use 1kV and some prefer 1.1kV grade insulation low voltage cable why??
We have two APFC panels in same station. I need how to connect CT in two APFC panels.can we take one CT in series connection or two separate CTs.
please send previous exams question papers
Mention the disadvantages of low power factor?
What do you mean by distribution transformers?
If oil and air can withstand a high MeV when used as an insulator in a transformer, what are the values of how high for each material?
In electrical what is earth(ground)connection, wht is the importance of it, why it is recomended to maitain below 3VAC between Neutral and earthspecially in PLC used machines?
how to calculate mf when meter and cTPT detail are given
could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com