what is the pre commissioning test to be carried out on LT power panel at site?
Answer Posted / arasusulo
checking the all of bus
bars tightness and visual
short at phase to phase and
neautral...
then megger the separate
phase and ntral bus too.
then circiut braker
condition tooo.then charge
the supply and check ph
voltage and line voltage.
switch on the braker then
dstrbt the suppply by the
feeder what it is..?
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?
in 132kv substation CRT means
3phase cable calculation formula by motor load
what is transformor oil gread
How do we calculate over and under frequency tolerance from generator data?
Write the force balance equation of ideal dashpot element.
Q: How to calculate Transformer losses , tell us by Formula.
Explain the purpose of inductor in an electric circuit?
What is the difference between electronic regulator and ordinary electrical rheostat regulator for fans?
How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.
How to calculate capacitor bank value to maintain unity power factor with some suitable example?
What is the requirement of grounding the neutral of single phase generators on load? If the neutral is not grounded, what will be the effect?
What are the advantages and disadvantages of negative feed back?
please send me previose rrb junior engineer qustion papers
What is MSL designation of a motor and same may be provided in details.