Answer Posted / senthil nathan. k
in the roof slab the reinforcement will be placed in following
points.
* In shorter span the spacing will be higher than the longer
span.
* In case of two way slab four corner will get crank
* In case of one way slab any side will be cranked
Ex.1. Corridor
2. Portico
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is different between DI Pipe and CI pipe?
What are the strongest shapes in building?
What do you mean by tolerance factor of concrete ?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
significance of specific surface area of particles?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
During reclamation how can the occurrence of mud waves can be rectified?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
what is the difference b/w full length and cutting length?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.