Answer Posted / tithi dey
Electrical BMS Means Battery Management system.
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
What do you mean by an instrument transformer?
(In MEP services) HVAC in AC Plant room what else can we provide if the chiller is not considered?
What is stepper motor?
What is control system?
List of equipments required foe industrial repair lab.
How it can worked plc based electrical system And which type of software using.
We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's
In convertor can we use rectifier thyristor in place of invertor thyristor with explain.
What is meant by Load Encroachment in OHL Feeder Protection?
how to handle 2500 kva transformar
How to calculate Ith (I thermal) for curent transformer
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
how to operate and maintenance of 1500 kva diesel generator set
What will be in Mahagenco Trade Test Exam? I want to know the same.
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.