what is lifespan of an RCC structure?
Why the RCC structures failing in quater of its life span?
Answer Posted / arun verma
When the RCC was developed in the early mid twentieth
century, the quality of each input was taken into account
based of the cost of inputs and the quality of our
integrity at that time.
With passage of time the quality of inputs have gone down,
One because of poor integrity of each of us contributing
into it be it the material manufacturer or the worker at
the workmanship stage.
and
Two because the cost of each thing be it labour or
material, has gone up substantially, compelling the
manufacturers and material suppliers to supply material at
competent rates, thereby prompting them to compromise in
quality.
Also while the factor of safety taken into account at time
was 3 X 3 times with plain mild steel, now with torsteel it
has been brought down presuming that the structures are
never stressed to that extent.
I believe, if we we are able to correct our mentality and
if the buyer agrees to pay the hike in the cost towards
improving the material quality and the workmanship, the
life will be atleast 80% of the stipulated life of 100
years.
Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Define What is diversion tunnel in a dam?
How many lbs are there in a yard?
how to stop beam concrete between column
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
How many square meter can mason layout chb per hour
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
what r you reqired for concrete baching plant?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
what is pouring and explain
at which depth the construction of tunnel is economical from cost and engineering aspect.
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?