Answer Posted / sanju mathur
the meanining of bts is "Base Transciever station"
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
is this the formula of building wiring to get the main breaker.Watts/volts*.8%+higher motor*(25%)=ampere. yes or no or send the correct formula for building wiring.
What is the selection process of breakers. Can any one please give a formulation on same?
Give details of your interested designation, the post you are interested to serve the company better and explain why you think you can serve the company better in such position if employed?
typically in power distribution substation. 1- Any idea how would be the graph of capacitor bank consumption verses time through the day . 2- How is the switching ( on and off ) of the capacitor bank, per need?
what will be happen if earth point is being used for as a neutral point for raw power , and same will be used for ups earthing
1.Can we use 6.6/11KV 300sq mm xlpe 3core cable for LT use (415 Volt). 2. If we use it for LT then what is the current rating
1 Ton is equal to how many watts?
how to Select Lighting arrester? What r the parameters to be considered for the selection of Lighting arrester ?
Testing report of Earthing of 3.15 MVa PTR.
give me a clear defination of inductance,and how can u calculate inductance of a motor
what is reactive power?, why its measured in VA ? is it transient behavior of system?
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
How halogen & merquery lamp works.
What is the power factor of a transformer at no load?
I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.