which type of foundation is used for seismic prone area?
Answer Posted / rajdeen
Pile foundation
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
What is meant by a context menu in a cad software?
very simple or less time consuming formula for reinforcement calculation by moment
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
What is the significance of cost estimate knowledge for an architect?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What year was the keystone power plant in Indiana County constructed?
How do you determine specific gravity of cement?
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
What is the l/d ratio of cantilever beam?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?